1.       RFQ#34 TELECOMMUNICATIONS PRE-OUTAGE AT WHARF 3 AT BARBOURS CUT TERMINAL 7/20/2016 @ 2:00PM

2.      CSP-70 BI-ANNUAL RAIL AND SWITCH REPLACEMENT AT TURNING BASIN TERMINAL 08/9/2016 @ 1:00PM

3.      RFQ-73 Preliminary Meeting Sign in Sheet 8/16/2016 @ 10:00AM

a.      Preliminary Meeting Presentation

4.      CSB-95  SALES OF SURPLUS METAL 8/25/2016 @ 10:00 AM

5.      CSB-94  SALE OF SURPLUS PASSENGER ACCESS GANGWAY SYSTEM 8/31/2016 @ 10:00 AM

6.      RFQ-101  DRAINAGE IMPROVEMENTS AT VOLKSWAGON YARD  8/31/2016 @ 10:00 AM

a.      Preliminary Meeting Presentation

7.      RFP-107: GATE OPERATING SYSTEM 7/25/2106 @ 10:00 AM

8.      CSP-112  Shipyard Services 9/14/2016 @ 1:00 PM

9.      RFP-107  GATE OPERATING SYSTEM 9/20/2016 @ 10:30 AM

10.  RFQ-147  Management of Placement Area at Bayport Container Terminal @ 1:30 PM

a.      Preliminary Meeting Presentation

11.  RFQ-148  Professional Engineering Services for Container Freight Station, Utilities and Drainage at Bayport Container Terminal @ 2:00 PM

a.      Preliminary Meeting Presentation

12.   CSP-146  Structural Concrete and Fender Repairs at Wharf No. 23 at Turning Basin Terminal @ 1:30 PM

13.   CSB-162  Bi-Annual Pavement, Drainage and Dust Control Work at Industrial Park East 2017-2018 Pre-Bid Meeting Presentation

14.   CSB-169 Replacement of C-1 Roof and Chiller at BCT 10/19/2016 @2:00PM

a.       Preliminary Meeting Presentation

15.   CSB-170  Replacement of Windows, Entrance Doors and Framework at Credit Union at Executive Office at Turning Basin Terminal 10/25/2016 @ 9:00AM

a.       Pre-Bid Meeting Presentation

16.   CSP-156 Revised Bi-Annual and Switch Replacement at Turning Basin Terminal 10/25/2016 @ 2:00 PM

17.   CSB-164  Bi-Annual Concrete Replacement at Turning Basin Terminal 2017-2018

18.   CSP-154  Woodhouse Terminal Water and Sewer Line Replacement 11/2/2016 @11:00 AM

19.   RFQ-160  Design Container Yard 7 at Bayport Container Terminal 11/2/2016 @ 1:30 PM

a.       Preliminary Meeting Presentation

20.   RFP-187  Industrial and Hazardous Waste Disposal Vendor Portwide 11/17/2016 @ 10:00 AM

21.   RFQ-182 CMT for All Port Authority Facilities and Locations 12/7/2016 @ 2:00 PM

22.   RFQ-196 CMT for Structural Concrete and Fender Repairs at Wharf NO. 23 at Turning Basin Terminal  11/21/2016 @ 10:00 AM

23.   CSB-192  Bi-Annual Pavement Replacement at Barbours Cut and Bayport Container Terminals 2017-2018 11/30/2016 @ 10:00 AM

24.   CSB-206  Purchase Tires for RTG Cranes and Terminal Equipment at Barbours Cut, Bayport Container and Turning Basin Terminal 12/14/16 @ 1:30 PM

25.   CSB-220  Repair of motors, generators and alternators for BCT, BPT and TBT 1/17/2017 @ 10:00 AM

26.   RFQ-182  CMT for all Port Authority Facilities and Locations 12/7/16 @ 2:00 PM

27.   CSB-217  Purchase of Cummins Diesel Engine Parts and Related Repairs 1/10/2017 @10:00 AM

28.   CSB-218  Purchase of Parts and Repair Services for Scales at BCT and BPT 1/10/2017 @ 11:00 AM

29.   CSP-214  Revised Woodhouse Terminal Water and Sewer Line Replacement 1/10/2017 @ 11:00 AM

a.        CSP-214  Pre-Proposal Meeting Presentation

 

30.   RFQ-216  OSHA Inspection and Certification Services for Cranes and Terminal Equipment at BCT, BPT and TBT 1/11/2017 @ 11:00 AM

31.   RFP-243  Cleaning Services 1/19/17 @ 3:00 PM

a.       Pre-Proposal Meeting Presentation

32.   CSB-240  Crane Rental for Maintenance of Equipment and Facilities Portwide 1/25/16 @ 10:00 AM

33.   CSB-250  Repair Services to festoon rollers for wharf cranes at Barbour’s Cut Terminal and Bayport Container Terminal 2/1/2017 @ 10:00 AM

34.   RFP-253 Vending Services 2/7/2017 @ 10:00 AM

35.   RFP-244  Purchase of six diesel  container cranes for Bayport Container Terminal 2/1/2017 @ 10:00 AM

36.   CSP-294  House Tract Placement Area Dewatering 2/21/2017 @ 10:00 AM

37.   CSB-291  Wharf 42/43 Collision Repair at Turning Basin Terminal – Damage Claim 2/15/2017 @ 1:30 PM

38.   RFP-311 JDEDWARDS CNC Managed Services 3/6/17 @ 10:00 AM

a.       RFP-311 Pre-Proposal Meeting Presentation

b.      RFP-311 JDEDWARDS CNC Managed Services 3/29/17 @ 1:00 PM

39.   CSP-320  Scrap Tire Removal and Disposal Services Portwide @ 1:00 PM

40.   RFP-333  Operating, Maintaining and Monitoring the Jacintoport Wastewater Treatment Plant 3/30/17 @ 10:00 AM

41.   RFP-345  Maintenance & Support Services for TOS, Applications & Hardware at TBT, BCT and BPT

42.   CSP-369  Bi-Annual Railroad Repairs as Needed for the Port of Houston at TBT @ 10:00 AM

43.   CSB-336  Mowing Service and Landscaping Maintenance for the Port of Houston Authority @ 9:00 AM

44.   RFP-389  Promotional Items and Ordering @ 2:00 PM

45.   CSB-408  Revised Wharf 42 and 43 Collision Repair at Turning Basin Terminal – Damage Claim 997 @ 2:00 PM

46.   CSP-429 Elevator Repair and Maintenance at TBT, BCT and BPT 6/22/2017 @ 10:00 AM

47.   CSP-430  Bayport Container Yard 6 North and South Security 6/27/2017 @ 11:00 AM

48.   RFP-435 General Environmental Services 6/28/2017 @ 1:00 PM

49.   CSP-449 Purchase of Wire Rope at BCT, BPT and TBT 7/12/2017 @ 10:00AM

50.   CSB-442  Retaining Wall Replacement at Shed 1 at Woodhouse Terminal 7/13/2017@ 2:00 PM

51.   CSB-448  Stevedore Support Bldgs 2 & 3 at Bayport Container Terminal 7/13/2017@10:00 AM

a.       Pre-Bid Presentation Slides

52.    CSB-461  Repair and Oil Testing of Transformers at BCT, BPT and TBT @ 11:00 AM

53.    RFP-464 Container Capacity Assessment 7.26.2017 @ 10:00 AM

a.        Pre-Bid Presentation Slides

 

54.   CSP-431 Batteries for Terminal Equipment 7.26.2017 @ 11:30 AM

55.   CSB-460 Purchase of captive replacement parts for Taylor handling equipment at BCT and BPT 7/19/17 @ 10:00 AM

 

56.   RFP-472  Enterprise Asset Software Capabilities Assessment Project 8/3/17@10:00 AM

a.       Pre-Proposal Presentation Slides

 

57.   RFQ-476  Professional Engineering Consulting Services for FICAP 2017 8.9/17 @ 1:00 PM

a.       Preliminary Meeting Slides

 

58.   RFQ-483  Prepare Site Specific Baseline Plans for FICAP 8.9.2017 @ 1:00 PM

a.       Preliminary Meeting Slides

 

59.   CSB-482  Purchase of New and Repaired J.R. Merritt Master Operator Controls for Wharf and RTG Cranes at Barbours Cut Terminal and Bayport Container Terminal 8.9.17 @ 11AM

 

60.   CSP-494  Short Trolley Rails and Gantrex Pads on 2 Wharf Cranes at BPT

 

61.   CSB-470  Wharf 27 Repair 10/04/2017 @9:00

 

62.   CSP-515 Wharf 1 & 2 at CARE Terminal – Phase 1 10/5/2017 @ 2:00

 

63.   CSP-533 Annual Crane Painting – BPT & BCT 10/17/2017 @ 10:00 

a.        Preliminary Meeting Slides

 

64.   RFP-531  Promotional Items and Webstore Ordering Program 10/10/2017 @ 10:00 AM

 

65.   CSB-541  Annual Concrete Replacement TBT 2018 10/23/2017 @ 2:00 PM

 

66.   RFP-537  Employee Benefits Consulting Services 10/23/2017 @ 1:00 PM

 

67.   RFQ-542  Conflict Investigation and Design along JacintoPort Blvd & Peninsula St from Beltway 8 to CARE & JacintoPort Terminals 10/30/2017 @ 10:00

 

68.   RFQ-546  Remove/Replace Ramp Road 7 Speed Gate 11/8/2017 @ 10:00 AM

a.       Preliminary Meeting Slides

 

69.    CSP-549 2018 - Annual Fender System Maintenance at BCT & BPT

 

70.   CSP-562  Demolition of Wharf Crane Nos. 6 & 13 and Relocation of Wharf Crane Nos. 5, 6, & 8 at Barbours Cut Terminal 11/20/17 @ 10:00 AM

a.       Pre-Proposal Meeting Slides

 

71.    RFQ-575  Analysis and Design for the Rehabilitation and Repair of Wharf 9 at TBT 11.29.2017 @ 9:00

a.       Pre-Proposal Meeting Slides

72.     RFQ-569  Redesign of Entry Gate at BCT 11.29.2017  @ 10:00

a.        Pre-Proposal Meeting Slides

b.       RFQ-569 Scoring Matrix

 

73.   CSB-567  Revised Rehabilitation and Repair of Wharf 1 at TBT 11-28-17 @ 10:00 AM

 

74.    CSB-577 Repair Storm Water Drain 12-07-2017 @ 10:00 AM

a.       CSB-577 Pre-Proposal Meeting Slides

 

75.   CSP-579 Vegetate Sight & Sound Berm at BPT 12-6-17 10:30 A.AM

a.       CSP-579 Pre-Proposal Meeting Slides

 

76.    CSP-599 Placement Area Maintenance Port-Wide 1-11-2018 9:30 A.M.

 

77.   CSB-595  Purchase of Grease, Misc Oils and Fluids Port-Wide 1-10-2018 10:00 A.M.

 

78.   CSP-619 Bi-Annual Warehouse Door Repair at TBT

 

79.   CSB-624  Installation of Tie-Downs for Cranes 3 and 4 at Barbours Cut Terminal

 

80.   RFQ-630  PES to Construct Container 1 & 2 North at BCT 2-1-18 10:00 AM

a.       RFQ-630  Pre-Proposal Presentation Slides

 

81.   CSP-626  Demolition of Lash Dock at Barbours Cut Terminal

 

82.   RFP-627  Lighting Infrastructure & Renovation Assessment

a.       RFP-627 Pre-Proposal Presentation slides

 

83.   CSB-636  Purchase of New and Repaired Printed Circuit Boards for Wharf and RTG Cranes at BCT and BPT

 

84.   RFP-638  News Media Monitoring Services and News Release Distribution Services

a.       RFP-638 Power Point Presentation

 

85.   CSB-640  Emergency Electrical Support Services for Substations and Switchgears

a.       CSB-640 Scoring Matrix

 

86.   CSP-666  Bi-Annual Warehouse Repair Services at TBT

 

87.   RFP-672  JDE One Program

 

88.   RFP-673  Storm Water Quality Program Management

 

a.       RFP-673 Scoring Matrix

 

89.   RFP-685 Sediment Sampling Services

 

90.   RFQ-683  Professional Engineering Services to Conduct Structural Analysis of Eleven Turning Basin Terminal Wharf Structures

 

a.       RFQ-683 Preliminary Meeting Presentation slides

 

91.    CSP-689  Executive Office Building Renovation

a.       CSP-689  Presentation Slides

92.   RFQ-693  Master Planning Studies and Investigations

a.       RFQ-693  Presentation Slides

93.   RFQ-692  PES for the Plan and Design of the Construction of East End at Bayport Container Terminal

a.       RFQ-692  Preliminary Meeting Presentation Slides

94.   CSP-690  Replacement of Short Trolley Rails and Gantrex Pads on Six Wharf Cranes at BPT